What is your installation process?

Our crew will arrive at your home on the day of installation. They will tarp off all the bushes and plants to ensure they are not damaged. All existing shingles and roofing materials will be removed including the felt to expose the wood decking. Once everything is removed, the decking will be thoroughly inspected for any rotting. All rotted decking will be replaced. The next step is to lay down the felt underlayment over the entire roof surface. Proper flashing is installed accordingly, and finally shingles begin being installed.

 Additionally, if Ridge Vent is being installed for the first time, the ridge will be cut to the correct specification and the ridge vent system will be installed with matching ridge cap to the shingle color selected. The last step is to caulk all roof penetrations and perform a final inspection to ensure all work has been completed. We complete the job with a thorough cleaning of the premises.

 Typically, the day following your installation your Sales Representative will meet with you to do walk around inspection with you to answer any questions and to ensure your roof replacement was completed to your satisfaction. Also, we will confirm everything has been cleaned up properly. In most cases, we will finish a house in 1 day, but please block off 2 days to allows the opportunity to complete a proper installation of your new roof.

Untitled (700 x 1000 px)

HOW TO PREPARE FOR ROOF REPLACEMENT PROJECT

STEP 1

Remove all fragile items including but not limited to the following: light fixtures, mirrors, pictures, figurines and any other fragile items from walls, ceiling and shelves. These items can fall if not firmly attached. We suggest you check to make sure that they are securely attached. If in doubt, take them down. Small cracks or crow’s feet may appear in older plaster and sometimes small particles of the acoustical will fall. TRiO Roofing & Construction cannot be held liable for these items as a result of re-roofing. 

Untitled (1920 x 740 px)

STEP 2

Remove All Important items from around the perimeter of the house that could be hit by falling roofing debris, such as cars, boats, furniture, barbecues, plants, sculptures, etc. TRiO Roofing & Construction cannot assume responsibility if these items are damaged.

Untitled (1920 x 740 px) (1)

STEP 3

Please be prepared for significant and continuous Noise! There will be constant hammering on your roof for up to 2 days, depending upon the size of your roof. You may wish to plan time away from your home on these days.

Untitled (1920 x 740 px) (2)

STEP 4

Please park your cars on the street for the period of time between delivery of materials and completion of your roof. Our vendors must deliver your shingles using large trucks, and TRiO Roofing & Construction must use our large work trucks during this time.

Untitled (1920 x 740 px) (3)

STEP 5

Please keep children and pets away from the work area until our crews are finished cleaning-up after your roof installation is fully completed!

Untitled (1920 x 740 px) (5)

STEP 6

Be prepared for a messy attic. Please cover everything in your attic, especially under the ridge line, with a plastic sheet or old blankets, etc. We can cover your valuables for a small fee of $150. TRiO Roofing & Construction cannot be held responsible for damaged to items left in the attic as a result of re-roofing.

Untitled (1920 x 740 px) (6)

STEP 7

Be prepared, you may lose service during your roof installation if you have satellite TV. We must remove and replace the satellite dish during the installation of your new roof. We have a signal finder to make sure we put your dish back in its proper position. On the rare occasion we unable to locate the signal, we will cover the cost of the service call to your satellite provider to reestablish the signal.

Untitled (1920 x 740 px) (7)

STEP 8

Cleaning will be done by our crews during and after your roof installation. We utilize the most up to date cleaning equipment, such as rolling magnets, pin magnets and metal detectors in our best effort to keep you safe. Nonetheless, please be advised some stubborn nails may remain hidden in brush and grass around the house after our final cleanup process is complete.

Untitled (1920 x 740 px) (10)

STEP 9

Driveway Reminders. Your driveway is where our vendors must deliver materials for your new roof. From time to time, there may be tire marks on your driveway from the forklift used during delivery. Most of the time a quick spray from a garden hose or a light rain will wash away the tire marks. On extremely rare occasions, a driveway may crack under the weight of materials and work trucks. Please be advised, TRiO Roofing & Construction cannot be held responsible for these damages to your driveway as a result of your re-roofing project.
Untitled (1920 x 740 px) (9)

STEP 10

Extra Material. TRiO Roofing & Construction will send slightly more material than is noted on your contract or scope of work. Our goal is to ensure we can complete your project in a timely manner. Any material left at the end of the project is property of TRiO Roofing & Construction and will be picked up within (3) business days after your installation is completed.

Untitled (1920 x 740 px) (11)

Frequently Asked Payment Questions

PAYMENT TERMS, INVOICING and WARRANTIES

For self-funded projects, we require 50% once materials are delivered and the balance upon completion.

For financed projects, the company will arrange payments at the customer’s request.

For insurance claims, TRiO Construction starts your project once the insurance company approves and issues the first check. After your roof is completed, we invoice your insurance to release a second payment directly to you. You'll receive a receipt and warranties within ten days of full payment. Note, a 2.5% monthly penalty applies for late payments beyond 30 days, and nonpayment may lead to a lien on your property.

Excitingly, your roof comes with a 5-year in-house leak warranty, valid unless another contractor has intervened or in case of storm damage. Additionally, Owens Corning provides a 50-year pro-rated warranty on materials. These warranties, detailed by your Sales Representative, are mailed upon full payment and roof completion.

INSURANCE COMPANY PAYMENTS

If you carry a “replacement cost” policy, which is the most common homeowner policy issued, then your insurance company will pay for the full replacement cost of your roof minus your policy’s deductible.

This type of policy will generally pay two installments for a new roof. The first installment check should be sent to the policyholder as soon as the adjuster has completed the damage assessment. The second installment is generally 10-40% of the total settlement and is held back until repairs are completed. This second check, usually referred to as “recoverable depreciation”, will be sent to the homeowner when the insurance company receives notification in the form of an invoice for payment, which TRiO Construction will submit directly to your insurance company accordingly.

Keep in mind, settlements are based on using similar quality materials for roof repairs. Discrepancies in cost, roof size, or damage scope between the homeowner, roofer, and insurer can occur. In such instances, TRiO Construction effectively resolves these issues with your adjuster, ensuring a seamless process for everyone involved.